What operating room construction design requirements?

2016-05-19     |    View: 3063    |    From:未知

Construction design requirements according to the operating room environment and customer requirements vary, the general requirements are as follows:

First, the seven-storey 3 m net operating rooms renovated, with room decoration net floor 2.8 meters.

Second, the operating room panels made of stainless steel plate modules. Attached room and other areas of inorganic coating clean plate finishes.

Third, each operating room power supply design, with a socket with three walls, one with a 380V socket with universal socket, one 16A universal socket, 3 10A universal socket, a network socket, and with grounding device. The other two with a 16A socket with universal socket, four 10A universal socket, a network socket, and with grounding device. Not designed to outlet (electric plug hanging bed tower).

Fourth, the use of cold light LED lamps, LED cold light film viewer. Film viewer cable 2-way switch points.

Fifth, the air-conditioning system: dual system (four pipe system), the solenoid valve with three-way valve, water-cooled, heat pump with the host, put a certain leeway. Each unit is equipped with a humidifier, electric heating (dehumidification), air-conditioning cycle unit one hundred, one thousand uses a drag system, 10,000 Three dragged.

Sixth, with 2 sets (with rooms, surgery) new air unit, specifically fans, motors origin, brand.

Seven, each operating room is equipped with writing desk, supplies warehouse with network cable, control panel with intercom calls.

VIII, No. 6 according to the operating room digital integrated design (brand Olympus, Stryker, Storz), construction units with construction. 1,2,3,4 renovated operating room by radiation (radiation operating room four weeks stereotype 2mm, height of three meters, the top, to 3cm barium cement), operating room 1,2,4 number one thousand, one hundred 3 class, number 5,6,7 ten thousand.

Nine, crane, shadowless lamp base for an apparatus construction unit installation, crane cable distribution network.

Ten, the operating room to attract, oxygen, compressed air systems. Wherein the suction system operating room alone.

XI, one hundred theater with insulation, freezer.

Twelve, carbon dioxide, anesthetic gas cylinder storage position in the operating room clean staircase on the north side. Adoption bus. Through seven operating room anesthetic gas, carbon dioxide through No. 5,6,7 operating room.

XIII device layer between 3,4 floors. All configuration, timber, cabinets, etc., a clear origin, specifications, models, materials, sheet thickness, quantity.

Fourth, between the northeast corner of disinfection installation with a separate outlet with a 380V universal socket, one 16A universal socket, 3 10A universal socket, and with grounding device.

XV pipeline anti-static design, emissions design.


返回

Next : What supply chamber construction design requirements?

Previous : Celebrate our new website on-line!

related articles
MORE >
Legal Notices | Sitemap
Project Honor
Feedback

Messges

  • Name :
  • Tel :
  • Email :
  • Title :
  • Message :
  • 发 送
QQ
分享按钮